A 10 x 10 ft slab with #4 rebar 12 in on center each way, 3 in from the edges, takes 22 bars 9.5 ft long (209 linear ft): buy eleven 20 ft bars, about 147 lb.
To figure rebar by hand, divide the space between the edge clearances by the bar spacing, round up, and add one bar, in both directions. Each bar is the slab size minus the clearance at both ends, cut from the 10 or 20 ft bars you buy.
The bar size, spacing, edge clearance, and lap come from your plans, your local code, or an engineer. Our rebar calculator for concrete slabs turns them into a cut list and a shopping list; it doesn't decide whether a slab needs steel.
How to measure for rebar
- Measure the slab inside the forms and convert to decimal feet (10 ft 6 in is 10.5 ft; see our square footage calculator). Split an L-shaped slab into rectangles and run each one.
- Take the bar spacing from your plans. It's center to center ("on center"), the same both ways.
- Set the edge clearance, the concrete between the slab's edge and the steel.
- Pick the bar size and the bar length your supplier sells, 10 or 20 ft.
- Enter the lap from your plans. It only counts when a run is longer than one bar.
How the calculator lays out the grid
- A bar at each edge. The outer bars sit at the edge clearance, and the space between them is divided by your spacing and rounded up, so no gap is wider than the spacing. The bars are spaced evenly.
- Splices. A run longer than one bar is full bars overlapped by the lap, plus one shorter piece.
- Cutting. Pieces are cut longest first, and a shorter piece goes into a leftover when it fits. Leftovers aren't spliced together, and saw cuts aren't deducted.
The result shows the offcuts and what the other bar length would take. It doesn't count chairs or tie wire.
The rebar formula
- Bars each way = (slab size in inches − 2 × edge clearance) ÷ spacing, rounded up, + 1
- Bar length (ft) = (other slab size in inches − 2 × edge clearance) ÷ 12
- Linear ft = bars × bar length, for both directions
- Pieces per run, if a run is longer than a stock bar = (run − lap) ÷ (stock length − lap), rounded up
- Weight = bars bought × stock length × lb per ft
Worked example (the calculator's default values)
A 10 x 10 ft slab, #4 bars 12 in on center, 3 in edge clearance, 20 ft bars, and a 30 in lap:
- 120 − 2 × 3 = 114 in. 114 ÷ 12 = 9.5, rounded up to 10 spaces, so 11 bars each way, 11.4 in apart.
- Each bar is 10 ft − 6 in = 9.5 ft. 22 × 9.5 = 209 linear ft, with no splices.
- Two pieces per 20 ft bar: 11 bars (220 ft), 11 ft of offcuts.
- 220 ft × 0.668 lb per ft = 146.96 lb, about 147 lb.
The calculator shows: "Buy 11 bars of #4 rebar, 20 ft long (about 147 lb)." and "11 bars 9.5 ft long run along the slab's length, 11.4 in apart, and 11 bars 9.5 ft long along its width, 11.4 in apart, 3 in from the edges: 209 linear ft of #4 bar. Cutting them from 20 ft bars leaves 11 ft of offcuts. With 10 ft bars: 22 bars (220 ft, no splices)."
Rounding down instead would give 10 bars each way and leave the last one 9 in from the far edge instead of 3.
Second example: a 12 x 12 ft slab
It's 13 bars each way, 11.5 ft long: 299 linear ft. Only one piece fits in a 20 ft bar: "Buy 26 bars of #4 rebar, 20 ft long (about 347 lb)." with 221 ft of offcuts. With 10 ft bars, each run is a full bar plus a 4 ft piece, lapped 30 in: "Buy 39 bars of #4 rebar, 10 ft long (about 261 lb)." That's 390 ft instead of 520, but 26 splices.
Third example: a 24 x 24 ft slab
It's 25 bars each way, 23.5 ft long: 1,175 linear ft. Each run is a 20 ft bar plus a 6 ft piece, so 50 splices add 125 ft: "Buy 67 bars of #4 rebar, 20 ft long (about 895 lb)." With 10 ft bars it's 150 bars and 100 splices.
Rebar sizes and weights
In the ASTM bar data Caltrans lists (Bridge Design Details, Table 13.1.1), each bar number is the diameter in eighths of an inch: a #4 bar is 0.500 in, or 4/8.
| Bar | Diameter | Weight per ft | 10 ft bar | 20 ft bar | IRC lap, Grade 40 / 60 |
|---|---|---|---|---|---|
| #3 | 3/8 in | 0.376 lb | 3.76 lb | 7.52 lb | not listed |
| #4 | 1/2 in | 0.668 lb | 6.68 lb | 13.36 lb | 20 / 30 in |
| #5 | 5/8 in | 1.043 lb | 10.43 lb | 20.86 lb | 25 / 38 in |
| #6 | 3/4 in | 1.502 lb | 15.02 lb | 30.04 lb | 30 / 45 in |
Gerdau lists the same weights and typical lengths of 20, 30, 40 and 60 ft. Home Depot lists #3 bars 10 ft long and #4 and #5 bars 20 ft long, and Lowe's a #4 bar 10 ft long. CRSI says a bar's rolled-on marks show the mill, then the bar size, then the steel type, usually "S" for ASTM A615 or "W" for A706.
Rebar size chart: #3 to #8
2.670 lb per ft for a #8 bar, against 0.376 lb for a #3: this chart adds #7 and #8 to the table above, with each size's cross-section area, its diameter over the ribs, and its metric size. Caltrans lists the diameters, areas, and weights from ASTM bar data and says to use the diameter over the ribs (the deformation diameter) when you check clearances; Gerdau lists the metric sizes.
| Bar | Diameter | Over the ribs | Area | Weight per ft | Metric size |
|---|---|---|---|---|---|
| #3 | 3/8 in (0.375) | 0.44 in | 0.11 sq in | 0.376 lb | 10 |
| #4 | 1/2 in (0.500) | 0.56 in | 0.20 sq in | 0.668 lb | 13 |
| #5 | 5/8 in (0.625) | 0.69 in | 0.31 sq in | 1.043 lb | 16 |
| #6 | 3/4 in (0.750) | 0.88 in | 0.44 sq in | 1.502 lb | 19 |
| #7 | 7/8 in (0.875) | 1.00 in | 0.60 sq in | 2.044 lb | 22 |
| #8 | 1 in (1.000) | 1.13 in | 0.79 sq in | 2.670 lb | 25 |
A 20 ft #7 bar weighs 40.88 lb and a 20 ft #8 bar 53.4 lb. The calculator's bar list stops at #6, but the bar size doesn't change how many bars it tells you to buy, only their weight. For #7 or #8, run it with any size and multiply the feet of bar it says to buy by 2.044 or 2.670 lb: the default 10 x 10 slab's eleven 20 ft bars (220 ft) would weigh about 450 lb in #7 or 587 lb in #8.
Rebar for common slab sizes
#4 bars 12 in on center each way, 3 in edge clearance, 30 in lap:
| Slab (ft) | Bars each way | Linear ft | 20 ft bars | 10 ft bars |
|---|---|---|---|---|
| 8 x 8 | 9 at 7.5 ft | 135 | 9 | 18 |
| 10 x 10 | 11 at 9.5 ft | 209 | 11 | 22 |
| 12 x 10 | 11 at 11.5 ft, 13 at 9.5 ft | 250 | 18 | 30 (11 splices) |
| 12 x 12 | 13 at 11.5 ft | 299 | 26 | 39 (26 splices) |
| 16 x 12 | 13 at 15.5 ft, 17 at 11.5 ft | 397 | 30 | 52 (30 splices) |
| 16 x 16 | 17 at 15.5 ft | 527 | 34 | 68 (34 splices) |
| 20 x 20 | 21 at 19.5 ft | 819 | 42 | 105 (84 splices) |
| 24 x 24 | 25 at 23.5 ft | 1,175 | 67 (50 splices) | 150 (100 splices) |
Runs just under 10 or 20 ft cut cleanly; runs a little over half a bar, like the 11.5 ft runs of a 12 x 12 slab, waste the most, so try both lengths. Spacing drives the count: on the 10 x 10 slab, 16 in spacing takes 9 bars each way (171 linear ft) and 18 in takes 8 (152 linear ft).
Rebar for common slab sizes at 12, 16, 18, and 24 in spacing
8 bars of 20 ft #4 rebar cover a 10 x 10 slab at 18 in on center each way, against 11 bars at 12 in. Each cell is what the calculator gives with #4 bars, 3 in edge clearance, a 30 in lap, and 20 ft bars: the linear feet of grid, the 20 ft bars to buy, and their weight.
| Slab (ft) | 12 in on center | 16 in on center | 18 in on center | 24 in on center |
|---|---|---|---|---|
| 8 x 8 | 135 ft, 9 bars (120 lb) | 105 ft, 7 bars (94 lb) | 90 ft, 6 bars (80 lb) | 75 ft, 5 bars (67 lb) |
| 10 x 10 | 209 ft, 11 bars (147 lb) | 171 ft, 9 bars (120 lb) | 152 ft, 8 bars (107 lb) | 114 ft, 6 bars (80 lb) |
| 12 x 10 | 250 ft, 18 bars (240 lb) | 198.5 ft, 14 bars (187 lb) | 177.5 ft, 13 bars (174 lb) | 135.5 ft, 10 bars (134 lb) |
| 12 x 12 | 299 ft, 26 bars (347 lb) | 230 ft, 20 bars (267 lb) | 207 ft, 18 bars (240 lb) | 161 ft, 14 bars (187 lb) |
| 16 x 12 | 397 ft, 30 bars (401 lb) | 304.5 ft, 23 bars (307 lb) | 277.5 ft, 21 bars (281 lb) | 212 ft, 16 bars (214 lb) |
| 16 x 16 | 527 ft, 34 bars (454 lb) | 403 ft, 26 bars (347 lb) | 372 ft, 24 bars (321 lb) | 279 ft, 18 bars (240 lb) |
| 20 x 20 | 819 ft, 42 bars (561 lb) | 624 ft, 32 bars (428 lb) | 546 ft, 28 bars (374 lb) | 429 ft, 22 bars (294 lb) |
| 24 x 24 | 1,175 ft, 67 bars (895 lb) | 893 ft, 51 bars (681 lb) | 799 ft, 46 bars (615 lb) | 611 ft, 35 bars (468 lb) |
Going from 12 to 24 in spacing cuts the steel to a little over half (114 of 209 linear ft on the 10 x 10 slab). Only the 24 x 24 slab needs splices with 20 ft bars, since its runs are 23.5 ft: from 26 splices at 24 in to 50 at 12 in. The spacing itself comes from your plans; the calculator only counts the grid you give it.
Lap splices: how much should bars overlap?
Where a run is longer than your bars, two bars overlap and are tied. The 2018 International Residential Code's lap table for concrete walls, Table R608.5.4(1), as reproduced in Element ICF's bulletin on lap splices, gives 20 in for #4 bars of Grade 40 steel and 30 in for Grade 60, 25 and 38 in for #5, and 30 and 45 in for #6. Section R403.1.3.5.4 points to that table, says wall reinforcement "shall be the longest lengths practical," and limits the gap between lapped bars to the smaller of one-fifth of the lap and 6 in.
The table doesn't list #3, and a slab's laps are part of its design, so use your plans. The 30 in default is the table's #4 Grade 60 figure. Home Depot lists its 20 ft #4 bar (REB/4/615G4/20) as Grade 40 and Weyerhaeuser's 20 ft #4 bar as Grade 60.
In bar diameters, the IRC table's laps work out to 40 for Grade 40 steel and about 60 for Grade 60: for a #4 bar, 20 in ÷ 0.5 in = 40 and 30 in ÷ 0.5 in = 60, and #5 and #6 match (38 in is 60 × 0.625 in = 37.5 in, rounded up). The same multiples give 15 and 23 in for #3, 35 and 53 in for #7, and 40 and 60 in for #8, but the table doesn't list those sizes. The Concrete Reinforcing Steel Institute (CRSI) notes that a lap's length varies with concrete strength, type of concrete, bar size, bar spacing, concrete cover, and ties or stirrups, and that lap lengths are always shown on placing drawings.
Edge clearance and where the bars sit
Marshalltown's slab guide says the bar ends "should be about two- to three-inches away from the edge of your form," and the calculator starts at 3 in. Where concrete is cast against and permanently in contact with the ground, ACI 318-19 requires 3 in of cover, the American Concrete Institute says, citing footings, retaining walls, and grade beams.
Height matters too. The California Residential Code, based on the IRC, says slab reinforcement must be supported "to remain in place from the center to upper one-third of the slab" during the pour: from 2 in to about 1 1/3 in below the top of a 4 in slab. Quikrete's patio plan sets rebar on bolsters, and Marshalltown raises it on rebar chairs.
Does your slab need rebar?
Not always. The residential code's slab section sets rules for reinforcement only "Where provided," and Quikrete's patio plan lists it as optional. Concrete Network says many slabs on a well-compacted base with properly spaced control joints don't need it, suggests rebar or welded wire for slabs more than 5 in deep, and notes that reinforcement won't prevent cracks but helps hold them together.
Footings, garage slabs, and anything that carries a building are structural: follow your plans and local code, and have an engineer or a qualified pro set the bar size, spacing, and laps. For the rest of the order, the concrete calculator puts the default slab at 1.36 cubic yards for 4 in thick with 10 percent extra, and the gravel calculator sizes the base under it.
Wire mesh vs rebar for a slab
0.028 sq in of steel per foot of slab, each way, is what 6x6 W1.4xW1.4 welded wire mesh carries; #4 rebar 12 in on center carries 0.20 sq in, about 7 times as much. The Wire Reinforcement Institute (WRI) names 6x6 W1.4xW1.4 (10 gauge) and 6x6 W2.9xW2.9 (6 gauge) as the two styles widely used in homes and light construction, and says designing with welded wire is the same process as with bars, with the steel area converted to a wire size and spacing. Per foot of slab width:
| Reinforcement | Steel per ft of slab, each way | Weight per 100 sq ft |
|---|---|---|
| 6x6 W1.4xW1.4 mesh | 0.028 sq in | 21 lb |
| 6x6 W2.9xW2.9 mesh | 0.058 sq in | 42 lb |
| #3 rebar, 18 in on center | 0.073 sq in | 50 lb |
| 6x6 W4xW4 mesh | 0.080 sq in | 58 lb |
| #3 rebar, 12 in on center | 0.110 sq in | 75 lb |
| #4 rebar, 18 in on center | 0.133 sq in | 89 lb |
| #4 rebar, 12 in on center | 0.200 sq in | 134 lb |
Mesh figures are WRI's; bar figures use the bar areas and weights above, for the grid alone, without laps or edge clearance. For a 4 in, lightly reinforced slab on ground, WRI's table calls for 6x6 W1.4xW1.4 up to 35 ft long, heavier wire as the slab gets longer, and 6x6 W4.0xW4.0 from 76 to 100 ft. Concrete Network calls mesh a good alternative to rebar for a typical residential driveway, patio, or sidewalk, and says steel reinforcement is especially important for a driveway that will carry large trucks or heavy traffic.
Either one has to sit in the slab, not under it. WRI puts mesh at or above mid-depth, on supports 2 to 3 ft apart, and doesn't recommend laying it on the ground and pulling it up during the pour ("hooking"). The calculator counts rebar only.
Rebar for footings: the IRC minimum
2 continuous #4 bars, one 3 to 4 in from the bottom of the footing and one within 12 in of the top of the stem wall, plus #4 vertical bars no more than 4 ft apart, are the minimum the International Residential Code (2021, Section R403.1.3) sets for a concrete footing and stem wall in Seismic Design Categories D0, D1, and D2:
| Footing | Minimum reinforcement (IRC R403.1.3) |
|---|---|
| Concrete stem wall on a concrete footing | One #4 bar 3 to 4 in from the bottom of the footing and one within 12 in of the top of the wall; #4 verticals no more than 4 ft on center, hooked at the bottom of the footing and extending at least 14 in into the wall |
| Masonry stem wall on a concrete footing | The same bars, with the stem wall solid grouted |
| Slab cast in one piece with a turned-down footing | One #4 bar at the top and one at the bottom of the footing, or one #5 bar or two #4 bars in the middle third of its depth |
| Slab not cast with the footing | #3 or larger dowels, hooked at each end, no more than 4 ft on center |
| Steel and cover | Grade 40 or higher (ASTM A615, A706, or A996); 3 in of cover where cast against the earth; 1 1/2 in for #5 and smaller and 2 in for #6 and larger in removable forms exposed to earth or weather |
| Laps | From the IRC lap table above (30 in for #4 Grade 60), with a gap between lapped bars of no more than 1/5 of the lap or 6 in, whichever is smaller |
To count the long bars, treat each line as a run. A 100 ft footing with 3 in of cover at each end is a 99.5 ft run: (99.5 − 2.5) ÷ (20 − 2.5) = 5.54, rounded up to 6 bars of 20 ft with a 30 in lap. Two lines take 12 bars (240 ft, about 160 lb of #4), plus the verticals or dowels. The calculator lays out a slab grid both ways, so count footing bars this way. Outside Seismic Design Categories D0 to D2 this section doesn't apply, so take the footing steel from your plans or building department.
Tips and common mistakes
- Rounding the bar count down. You need a bar at each edge clearance.
- Forgetting the clearance at both ends. A 10 ft slab takes 9.5 ft bars, not 10 ft.
- Buying by linear feet alone. 299 ft for a 12 x 12 slab isn't 15 bars of 20 ft: each 11.5 ft run needs its own piece.
- Counting on a full 10 ft. Lowe's gives its "10 ft" #4 bar's actual length as 9.9895 ft.
- Leaving the grid on the ground. Set it on chairs at or just above mid-depth.
- Forgetting the walls on top. The concrete block calculator counts the blocks for a wall; its reinforcement comes from your plans.
Frequently asked questions
How much rebar do I need for a 10x10 slab?
With #4 bars 12 in on center and 3 in from the edges, 22 bars 9.5 ft long (209 linear ft): eleven 20 ft bars or twenty-two 10 ft bars, about 147 lb.
How much rebar do I need for a 12x12 slab?
At the same spacing, 26 bars 11.5 ft long (299 linear ft): twenty-six 20 ft bars, or thirty-nine 10 ft bars with 26 splices at a 30 in lap.
How much rebar do I need for a 20x20 slab?
42 bars of 20 ft #4 rebar (819 linear ft, about 561 lb) at 12 in on center each way, 3 in from the edges: 21 bars 19.5 ft long each way. At 16 in it's 32 bars (624 ft, about 428 lb), at 18 in 28 bars (546 ft, about 374 lb), and at 24 in 22 bars (429 ft, about 294 lb).
How much rebar do I need?
Count the bars each way: subtract the edge clearance at both ends, divide by the spacing, round up, and add 1. Each bar runs the slab's other dimension minus both clearances. With #4 bars 12 in on center and 3 in from the edges, a 20 x 20 ft slab takes 21 bars 19.5 ft long each way, 819 linear ft: forty-two 20 ft bars, about 561 lb. Take the bar size, spacing, and laps from your plans.
How much does rebar weigh per foot?
#3 is 0.376 lb, #4 0.668 lb, #5 1.043 lb, and #6 1.502 lb per foot. A 20 ft #4 bar weighs 13.36 lb.
What size is #4 rebar?
1/2 in (0.500 in) nominal diameter, about 0.56 in over the ribs, with 0.20 sq in of steel and 0.668 lb per ft; its metric size is 13. Each bar number is the diameter in eighths of an inch, so #3 is 3/8 in, #5 is 5/8 in, and #8 is 1 in.
How far should rebar be from the edge of a slab?
Marshalltown puts the bar ends about 2 to 3 in from the form, and ACI 318-19 requires 3 in of cover where concrete is cast against the ground. Use the figure on your plans.
How much should rebar overlap?
20 in for #4 Grade 40 bars and 30 in for Grade 60, in the IRC's lap table for concrete walls: 40 and about 60 bar diameters. #5 bars take 25 and 38 in, and #6 bars 30 and 45 in. Use the lap on your plans; CRSI notes it varies with the concrete, bar size and spacing, cover, and ties.
Does a concrete patio need rebar?
Not always. Quikrete lists reinforcement as optional in its patio plan, and Concrete Network says many slabs on a well-compacted base with proper control joints don't need it.
Can I use wire mesh instead of rebar?
6x6 W1.4xW1.4 welded wire mesh, one of the two styles the Wire Reinforcement Institute says are widely used in homes, has 0.028 sq in of steel per foot of slab each way, about a seventh of #4 rebar 12 in on center (0.20 sq in). Concrete Network calls mesh a good alternative for a typical residential driveway, patio, or sidewalk; for heavy trucks, footings, or anything structural, follow your plans. Either way, set it on supports, not on the ground.
How much rebar do I need for a footing?
2 continuous #4 bars at minimum where the International Residential Code requires footing steel (Seismic Design Categories D0, D1, and D2): one near the bottom of the footing and one near the top of the stem wall, or one at the top and one at the bottom of a turned-down slab footing. For 100 ft of footing that's 12 bars of 20 ft with 30 in laps (240 ft, about 160 lb), plus the verticals or dowels. Elsewhere, use your plans.
Sources
- Caltrans: Bridge Design Details 13.1, Reinforcement (September 2025, PDF)
- Gerdau: Straight Rebar
- Concrete Reinforcing Steel Institute (CRSI): Bar Identification
- Element ICF: Technical Bulletin No. 4, Lap Splices and Dowels (PDF)
- American Concrete Institute: Epoxy-coated reinforcement and cover depth against ground
- 2025 California Residential Code, Chapter 5 Floors, Section R506
- MARSHALLTOWN: Pouring a Concrete Slab
- QUIKRETE: Building a Concrete Patio
- Concrete Network: A Guide to Reinforcing Concrete Slabs
- Concrete Network: How Thick Should a Concrete Driveway Be?
- The Home Depot: 1/2 in. x 20 ft. #4 Rebar
- The Home Depot: Weyerhaeuser 1/2 in. x 20 ft. #4 Grade 60 Rebar
- The Home Depot: 3/8 in. x 10 ft. #3 Rebar
- The Home Depot: 5/8 in. x 20 ft. #5 Rebar
- Lowe's: 1/2-in x 10-ft Steel #4 Rebar
- Concrete Reinforcing Steel Institute (CRSI): Splicing Bars
- Wire Reinforcement Institute: TF 202-R-21, How to Specify, Order & Use Welded Wire Reinforcement in Light Construction
- Wire Reinforcement Institute: TF 702-R-21, Supports for Welded Wire Reinforcement in Slabs-On-Grade
- Wire Reinforcement Institute: Welded Wire FAQs
- 2021 Seattle Residential Code, Chapter 4 Foundations, IRC R403 Footings (PDF)
Spot an error? Tell us.